Pressure switch service
📍 Julian
Took apart the pressure switch to clear contacts and confirm the nipple was open. The well stayed on its normal cycle after the cleaning.
Real completed jobs from our crew across San Diego, Riverside, and San Bernardino counties. These July and August 2026 jobs include pump replacements, diagnostics, pressure-tank work, and control-panel repairs.
📍 Julian
Took apart the pressure switch to clear contacts and confirm the nipple was open. The well stayed on its normal cycle after the cleaning.
📍 Temecula
Replaced a 40/60 pressure switch after ants packed the contacts. The 2 HP well was cycling normally on the new switch.
📍 Anza
Inspected a locked-up tank float and rotted fill-line fittings. Documented the PVC, valve, and float parts needed to restore automatic fill.
📍 Anza
Reset tripped breakers and straightened bent pump-saver pins so the 1 HP control box lid would seat. The well cycled at a normal 9.4 amps.
📍 Warner Springs
A booster was overheating and would not hold 50 psi. Bled air, eased the pressure switch, and confirmed the tank is likely waterlogged.
📍 Temecula
Replaced a failed pressure transducer, a melted check valve, and a waterlogged 4.5-gallon tank. The booster now comes up to speed and shuts off cleanly.
📍 Valley Center
Reconnected loose motor leads so the well would run. Recommended a new pressure tank as the next fix.
No projects found for this filter.
From emergency repairs to new well drilling, our team is ready to help.