Real completed jobs from our crew across San Diego, Riverside, and San Bernardino counties. These July and August 2026 jobs include pump replacements, diagnostics, pressure-tank work, and control-panel repairs.
📍 Warner Springs
Diagnosed slow pressure drop on a system with seized 2-inch gate valves that could not be isolated. The well itself was building pressure.
📍 Poway
Installed a new 1-inch spin-down filter with a brass valve and schedule-80 PVC so sediment can be flushed at the well.
📍 Poway
Evaluated the well, booster, and aging storage tank. Documented pressure-tank and storage options for the house and uphill irrigation.
📍 Ocotillo
Stopped a leak at the wellhead with new 1-1/4 inch galvanized nipples, couplings, and a PVC coupler.
📍 Descanso
Traced fill and booster lines between two storage tanks to isolate a PVC leak and map which valves feed suction versus fill.
No projects found for this filter.
From emergency repairs to new well drilling, our team is ready to help.